Map › All cables › JKC
JKC
JKC is a submarine telecommunication cable connecting 2 countries. The cable has been retired (1997). The system is 285 km long.
Facts
| Status | Retired |
|---|---|
| Ready for service | 1980 |
| Retired | 1997 |
| Length | 285 km |
| Owners | KDD |
| Countries | Japan, South Korea |
| Also known as | Japan-Korea Cable |
The exact route of this cable is not mapped yet; the map shows its landing points.
Landing points
| Landing point | Country | Other cables here |
|---|---|---|
| Hamada, Shimane | Japan | |
| Pusan (Busan) | South Korea | APCN, APCN 2, APG, CUCN (China-US Cable Network), EAC-C2C, FLAG North Asia Loop / REACH North Asia Loop (FNAL), KJCN, NCP, RJK |